01 / THE PROBLEM

A reason to build.

Services and storage had outgrown their original host. Consolidating them meant moving real workloads while preserving access, data, and a recovery path.

02 / THE APPROACH

How the pieces fit.

  1. 01

    Staged the storage and service migration before the network cutover, using a production VM and dedicated containers for different workloads.

  2. 02

    Moved the media-serving workload onto a container with local storage bindings, removing the previous NFS dependency for that path.

  3. 03

    Migrated smart-home services separately and repurposed the former server as an administration workstation.

  4. 04

    Used backups, retained rollback resources, and a verification soak to check the migrated core rather than treating a successful copy as completion.

Virtualization host
Isolated workloads
Storage + backups
03 / THE RESULT

What came out of it.

Migrated the core storage, production services, media serving, and smart-home workloads. The documented core passed its verification soak; deferred migration items were tracked separately.

VERIFICATION

Documented staged cutover, backup configuration, workload checks, incident diagnosis, and verification soak. Private infrastructure; the topology here is intentionally abstract.

04 / THE TAKEAWAY

What I’d carry forward.

A hardware NIC hang looked like a migration failure. Checking the hypervisor and guest separately prevented a bad diagnosis. Hypervisor renames also need their supported migration procedure, not a normal hostname change.